Anton Zolotavin
Портфолио
Rockwell Automation
- Field instrumentation commissioning, maintenance and troubleshooting; - Project engineering; - Control logics remote implementation and execution for NAS Colombia highpressure gas pipeline; - RTU/PLC configuration and algorythms implementation; - SCADA modification and troubleshooting; - Development of 3-dimentional SCADA HMI based on gaming engine; - Modern instrumentation market analisys; - Competitive SCADA market analysis/technologies and features comparisonand evaluation;- Multiphase flow meter technology evaluation for future integration withSCADA; - Analisys of future industry trends; - Evaluation of RTU's, SCADA systems and instruments of different vendorsfor upgrade of competitiveness of company products and services; - Configuration and preparation of instruments for further quick installation andcommissioning; - HMI development for local operator panels; - RTU programming (LD, IL, FBD), including PID tuning; - Sales team technical support by preparing demo; - Introduction and implementation of Standard Operating Procedure (SOP)system across operations department. - Installation of both Wired and Wireless RTUs and Transmitters.
Polpharma Biologics
Automation Expert
Emerson Automation Solutions
- Supporting SCADA and RTU projects across Middle East and Africa; - Lead Engineer in SCADA projects in Kuwait; - Providing technical consulting to Sales team; - Reviewing and approving solutions prior to customer submission (Architecture, Schedule, Cost, Functional Design); - Providing DCS reliability and performance consultancy services; - Received company recognition for number of quality sales leads; - Received customer recognition letter for continuous good level of support andproactive behavior. Major projects on this position: - KOC Kuwait Integrated Digital Field Halliburton (KwIDF). 49 key producerwells with optimization – maintenance, 800 wells data quality assurance. Our team has built a high-reliability Digital Oilfield control and informationsystem with well optimization. We have managed to achieve 97% oilproduction measurement accuracy with well modeling algorithms based onhighly dependable field data, ESP pump early failure prediction, automateddata reliability notifications and automated workflows distributed between field,Control Systems and MIS.Redundant SCADA servers interfacing PI Historian. Ensuring continuousdata flow with high availability and quality from the field level up to IntelligentManagement System. Continuous operational improvement for more effectiveservices and cooperation between departments. Proposed and implementedbasic data analysis to be processed on RTU level to reduce complexity ofcentral MIS. - KOC Well Surveillance ESP data monitoring system. 350+ wells. Redundant SCADA servers interfacing PI Historian. Participation in project engineeringand commissioning. - KOC WARA Pressure Maintenance Project. 30 remote locations - monitoringand control. Redundant SCADA servers interfacing DeltaV DCS. Siteacceptance test and maintenance/troubleshooting. - KOC Weatherford 127 RTU upgrade. Participation from project kick-off to SiteAcceptance.